Previously in my shed (solar power experiment) I've been able to get by with one panel charging the 24V system (see this post wrly called 'over paneled'). So while the panel spec (Vmpp = 30.4V Impp=8.2A) was suited to charging the lead acid system (to 26.6V) it wasn't suitable to charge the LFP cells to my desired 3.5V per cell (which is more like 28V).
While it would appear on paper to have the required grunt the practice was that somehow it lacked enough push to go beyond 26.6V (even with a LTM MPPT charger on it).
So, as I initially bought two panels I dragged the other one out from under the house and wired it in (in series) to see if that would enable the MPPT to do more MPPT DC-DC magic with a little more overhead in supply side.
and it absolutely did ... even with the first rising of the sun (this picture is in the afternoon, and facing west) with only tangential sun illumination of the existing panel (just visible on the roof) it was putting an Amp into the cells and by the time that panel was fully in sun the pack was charged!
Some research on my part suggests that charge to 3.5x is a good medium between squeezing every last drop of energy in and out of the pack while reducing the aging and stresses. This article demonstrated this with LFP cell charge discharge values like this:
So, now the task is to mount the panel on the roof of the shed ...
I've set the BMS to shut off charging if any one cell goes over 3.65V (but then it does its internal balance if other cells are still low) and the cell Unver Voltage Protection is set to 2.5V (which I may elevate but my inverter shuts down at 22V ... which is before the BMS shutdown).
until next time.